
Forge Lead Time
4hours to spec lock
Briefing call to locked spec in under four hours.
Your project manager calls at 08:30. By 12:30 you have a confirmed Bill of Materials — every dimension, every finish code, every edge-banding Pantone reference locked in writing. No ambiguity reaches the factory floor.
- Dedicated project manager assigned within 30 minutes of enquiry
- Material samples dispatched same day if Pantone match required
- Bill of Materials issued with fixed unit pricing — no estimates
- Production slot provisionally reserved against your delivery date
Benchmark Comparison
vs Traditional Joinery
Forge Lead Time
24hrs to sample delivery
Physical sample on your site by next-day courier.
Where other manufacturers talk about prototypes, Forge ships one. A full-size panel cut from your specified MDF grade, edge-banded in your Pantone, arrives next morning. Sign-off happens before a single production unit is cut.
- Sample CNC-cut from production-grade MDF — not a mock-up
- Edge-banding applied at exact Pantone reference specified
- Next-day courier to any UK mainland address
- Digital sign-off portal — approve from site, no site visit required
Benchmark Comparison
vs Traditional Joinery
Forge Lead Time
3days full production run
CNC routers running at 06:00. Your panels cut by 14:00.
Three Biesse CNC routing centres running dual shifts. MDF arrives as 2440×1220 sheets; it leaves as finished, wrapped, labelled panels — cut, drilled, edge-banded, and quality-checked against your BOM in a single production flow.
- Three Biesse CNC centres — 240 panels per shift capacity
- Automated edge-banding line: 0.4mm PVC or ABS to any Pantone
- In-line dimensional QC check: every panel measured before wrapping
- Finished panels wrapped in protective film and labelled to your room schedule
Benchmark Comparison
vs Traditional Joinery
Forge Lead Time
1day UK mainland delivery
Flat-bed loaded by 07:45. Site ETA confirmed to the hour.
Panels leave Sheffield on dedicated curtainsider trailers — not shared groupage. Each pallet is labelled to your room schedule so site teams unpack in sequence. Delivery window confirmed 48 hours in advance to the hour.
- Dedicated curtainsider — no shared groupage, no transit damage risk
- Pallets labelled to floor plan: Room A / Room B / Server Room
- Driver calls site contact 1 hour before arrival
- Tail-lift and pallet truck included — no site equipment needed
Benchmark Comparison
vs Traditional Joinery
Forge Lead Time
6hrs — 20-desk floor plate
Boardroom handed over by 17:00. No floor shut-down required.
Two-person installation crews work to your room schedule — not ours. Panels arrive pre-drilled to your fixing centres. A 20-desk floor plate installs in under 6 hours. The only thing left on site when we leave is furniture.
- Pre-drilled to your fixing centres — no site drilling, no dust
- Installation crew works around live occupancy if required
- 20-desk run installed and levelled in under 6 hours
- Debris removed, site left clean — zero snag list is the standard
Benchmark Comparison
vs Traditional JoinerySide-by-Side
Why Forge Wins
Every Tender.
Ready to see these numbers applied to your specific project?
11,400+
Units shipped in 2025
8.5
Days average lead time
99.2%
On-time delivery rate
£0
Import surcharges ever
Start Your Order
Your deadline
is our spec.
Tell us your project type, quantity, and required delivery date. We'll send a production-confirmed timeline within 2 hours — not a quote range, a date.
What you get in your timeline
- Production start date confirmed against live machine schedule
- Phase-by-phase breakdown: cut, edge, assemble, wrap, dispatch
- Delivery window to your site — flat-pack or installed
- Spec confirmation: dimensions, finish, edge-banding Pantone ref
- Direct line to your production contact — no account managers
